In March 2022, in the face of the severe COVID-19 outbreak in Qingdao, Laoshan Health Center was put into operation at the first time. Lida Group and China Construction Engineering Group Co., LTD. The construction of a health center with a total floor area of 28,000 square meters and 1,617 emergency container houses will be completed in the shortest time.
Project Name: Qingdao Laoshan Health Center Project
Customer Name: China Construction Eighth Engineering Bureau
Project Address: Qingdao city
Product to use: Flatpack container houses
About Lida
Lida Group was established in 1993, as a professional manufacturer and exporter which is concerned with the design, production, installation, and marketing of engineering construction.
Lida Group has achieved ISO9001, ISO14001, ISO45001, EU CE certification (EN1090) and passed SGS, TUV, and BV inspection. Lida Group has obtained Second Class Qualification of Steel Structure Professional Construction Contracting and General Contracting Qualification of Construction Engineering.
Lida Group is one of the most powerful integrated building engineering companies in China. Lida Group has become a member of several associations such as the China Steel Structure Association, China Council for the Promotion of International Trade and China Building Metal Structure Association, etc.
The main products of Lida Group contain a large-scale labor camp, Steel structure buildings, LGS Villa, Container house, Prefab house, and other integrated buildings. Till now, our products have been exported to more than 145 countries and regions.
Post time: Apr-08-2022